(Fixed March 18) Prefectural management drainage measures special business Ukijima District Ordinance 4th February 4th Fiscal Land Dust Removal Production Installation Construction Construction Construction Construction Construction Construction.
Corrected "tender announcement" in attachment.
Advertisement
Regarding construction work ordered by Fukuoka Prefecture, general competitive bidding will be conducted as follows.
March 15, 2020
Fukuoka Prefecture Governor Seitaro Hattori
1 Construction name
Prefectural Drainage Measures Special Project Ukishima District Construction No. 1 in 2020 Dust Remover Manufacturing and Installation Work
2 Construction site
Ukishima, Kijimacho, Kurume City
3 Ordering method for construction work
(1) For this construction work, technical materials related to the construction plan, etc. will be received at the time of bidding, and the successful bidder will be determined by comprehensively evaluating factors other than the price and the price. This is the target construction of the comprehensive evaluation method (simplified type).
(2) This construction does not apply the minimum price limit system, but applies the low bidding price survey system.
(3) For this construction, a survey standard price (hereinafter referred to as "survey standard price") and a disqualification standard price (hereinafter referred to as "disqualification standard price") are set for the low bid price survey.
Furthermore, the details are according to "Fukuoka Prefecture Construction Work Low Bid Price Survey Trial Guidelines" (hereinafter referred to as "Low Bid Price Survey Trial Guidelines").
(4) This construction is a construction subject to electronic bidding, in which bidding procedures (from submission of an application for confirmation of eligibility to participate in competition to determination of a successful bidder) are conducted using an electronic bidding system.
(5) In this construction, if a managing engineer (hereinafter referred to as "special managing engineer") subject to the proviso of Article 26, paragraph 3 of the Construction Industry Law is to be assigned, the following All of the requirements from A to K must be met.
A. Assign a full-time person to assist the managing engineer in accordance with the proviso of Article 26, Paragraph 3 of the Construction Business Act (hereinafter referred to as "assistant managing engineer").
B. The assistant managing engineer must be a nationally qualified person such as an assistant first-class construction management engineer or a first-class construction management engineer, and a person who is qualified as a managing engineer based on his academic background and practical experience. In addition, technical examination items based on the provisions of Construction Industry Law Article 27 for assistant managing engineers should be the same as the technical examination items required for special managing engineers.
C. The assistant managing engineer must have a direct and permanent employment relationship with the bidder.
D. The number of construction projects that can be assigned by the same special supervising engineer is up to 2 at the same time, including this construction work. (However, if the construction is related to multiple contract contracts with overlapping contract construction periods concluded by the same or different orderers with the same construction company, and there is no unity in the structures, etc. that are the targets of each construction. For those that are permitted (limited to cases where a contract other than the initial contract is concluded as a negotiated contract), these multiple constructions are regarded as one construction.)
E. The construction work that the special managing engineer can concurrently serve must be construction work within Fukuoka Prefecture. (This is not limited to work ordered by the prefecture.)
F. Exceptional managing engineers must properly perform duties such as participating in major meetings in construction, patroling the site and witnessing major processes.
G There must be a system that allows constant communication between the special managing engineer and the assistant managing engineer.
K Clarify the duties, etc., that the assistant managing engineer is responsible for.
K Regarding the on-site safety management system, the special supervising engineer does not also serve as the general safety and health manager.
(6) For this construction, only when the FY2020 budget for the construction is established, the national budget for the construction is determined, and the budgetary administrative procedures are in place, the procedures after the opening of the bid will be performed. conduct.
4 Construction overview
Installation of machinery and equipment
Dust remover manufacturing and installation work 1 set
〇Production: Dust remover (rear descending front raking type)
1900mm x 3420mm x 3
Mounting frame 1 set
Horizontal conveyor 600 mm x 8400 mm 1 unit
Electric equipment 1 set
5 Construction period
From the date of contract conclusion to Monday, March 20, 5th year of Reiwa
6 The name and location of the department in charge of contract work
(1) Bidding procedures and construction
7-7 Higashi Park, Hakata-ku, Fukuoka City, Fukuoka Prefecture 812-8577
Fukuoka Prefectural Agriculture, Forestry and Fisheries Department Rural Development Division Bid Section (Prefectural Office Administrative Building 5F)
Phone number 092-643-3527
Fax number 092-643-3507
(2) Concerning contract procedures
〒830-0047 1712-1 Tsufukuhoncho, Kurume City, Fukuoka Prefecture
Fukuoka Prefecture Chikugo River System Farmland Development Office General Affairs Section (Chikugo Land Improvement Hall Main Building 2F)
Phone number 0942-39-7971
(3) Matters related to inspection of design drawings, etc.
〒830-0047 1712-1 Tsufukuhoncho, Kurume City, Fukuoka Prefecture
Fukuoka Prefecture Chikugo River System Farmland Development Office General Affairs Section (Chikugo Land Improvement Hall Main Building 2F)
Phone number 0942-39-7971
7 Bid Participation Qualifications (This refers to the bid participation qualifications established based on the provisions of Article 167-5, Paragraph 1 of the Local Autonomy Law Enforcement Order (Cabinet Order No. 16 of 1947). The same shall apply hereinafter.)
< p>For machine equipment installation work, we have obtained the qualifications stipulated in the "qualifications required for those who participate in competitive bidding for contract contracts such as construction work carried out by Fukuoka Prefecture (March 2016, Fukuoka Prefecture Notification No. 219)". Those who are registered in the list of participants in the 2021 Fukuoka Prefecture construction work competitive bidding (hereinafter referred to as the “list of qualified bidders”).8 Bid Participation Conditions (Bid Participation Qualifications stipulated based on the provisions of Article 167-5-2 of the Local Autonomy Law Enforcement Order. The same shall apply hereinafter.)
March 30, 2022 (Wednesday) Currently, the following conditions must be met:
In addition, the same conditions must be met at the time of the successful bid decision.
(1) Do not fall under Article 167-4 of the Local Autonomy Law Enforcement Ordinance.
(2) Not during the period of nomination suspension (hereinafter referred to as "nomination suspension") based on the guidelines for suspension of nomination of construction companies related to construction work in Fukuoka Prefecture (June 30, 1987) .
(3) Not during the measure period based on the provisions of Article 7, Paragraph 2 of Fukuoka Prefectural Construction Work Competitive Bidding Participant Rating and Selection Guideline (September 22, 1979, general affairs manager order notice).
(4) A person who has filed a petition for the commencement of rehabilitation proceedings based on the Corporate Rehabilitation Act (Act No. 154 of 2002) or has filed a petition for the commencement of rehabilitation proceedings based on the Civil Rehabilitation Act (Act No. 225 of 1999) (Excluding those registered in the list of eligible bidders based on the examination of business matters, with the day after the date of the decision to commence the proceedings as the examination reference date after the decision to commence reorganization proceedings or after the decision to commence rehabilitation proceedings has been made. .).
(5) Not being a contractor of design work related to the construction or a construction company related to the contractor in terms of capital and personnel.
(6) The construction business law (Law No. 100 of 1949) must be licensed for machine equipment installation work.
(7) The business office specified in Article 3, Paragraph 1 of the Construction Industry Law is in Fukuoka Prefecture, and the business office is registered in the list of qualified bidders for the installation work of machinery and equipment, and is classified by contractor grade The rating must be A grade.
(8) Construction track record of the same type of construction that has been completed and completed as the prime contractor for public works since 2006 (however, the construction track record as a JV is for members with an investment ratio of 20% or more) (Limited to achievements as a company.) in Fukuoka Prefecture.
The same type of work is defined as dust remover manufacturing work (including repairs and repairs).
(9) Regarding the machinery and equipment installation work, it is possible to assign a full-time managing engineer or chief engineer to the main construction. However, you must continue to have an employment relationship with the construction company to which you belong for at least 3 months.
In addition, full-time engineers must be those listed in the following a or b.
A. Of the second examination pursuant to the provisions of Article 4, Paragraph 1 of the Professional Engineer Law (Law No. 25 of 1983), the technical department is the mechanical department or the general technical supervision department (the elective subject is related to the mechanical department ).
A Person who has a managing engineer qualification certificate and a managing engineer course completion certificate for the machine equipment installation work.
(10) A simple construction plan is appropriate. “Appropriate” means that the required items are described and that there is no obvious deviation from the issues indicated by the ordering party.
9 Items related to overall evaluation
(1) Evaluation items and evaluation criteria
Evaluate and add points for each evaluation item in Table 1 based on the evaluation criteria.
(2) Comprehensive evaluation method
A standard score (100 points) is given to all bidders who satisfy "8. Bid Participation Conditions", evaluation is made for (1), and an additional point is added in the range of 0 to 20 points as a technical evaluation score. In addition, those who bid more than the low bid price survey standard comparison price will be given a construction system evaluation point (1.1 points), and the evaluation value obtained by dividing the total score by the bid price will be used. The evaluation criteria are shown in Table 1.
(calculation formula)
Technical evaluation score = standard score (100 points) + additional points (0 to 20 points)
Evaluation value = [(Technical evaluation score + Construction system evaluation score (1.1 points)] / [Bid price]
(3) Bidding method
A. Bidders who bid with the price and technical data, and who applied with a price within the range of the planned price and the disqualification standard price, the numerical value obtained by (2) (hereinafter referred to as the "evaluation value") ) will be the successful bidder, and the successful bidder will be determined based on the Low Bid Price Survey Trial Guidelines.
B. If there are two or more people with the highest evaluation value, the winning bidder will be determined by lottery.
(4) Preparation of technical materials
Technical documents shall be prepared based on the tender documents.
10 Delivery of bidding documents
(1) Period
Every day from March 15, 2020 (Tuesday) to April 27, 2020 (Wednesday) 9:00 a.m. to 5:00 p.m., excluding holidays stipulated in Article 1, Paragraph 1 (hereinafter referred to as “prefectural holidays”).
(2) Location
Department of 6 (1) and (2). In addition, it is also possible to obtain it by downloading it from the website of Fukuoka Prefecture.
11 Place where contract clauses, etc. are indicated
The draft construction contract for this project will be inspected in 6 (2), and the design drawings and specifications will be inspected in 6 (3).
12 Acceptance of bid participation applications
From 8:30 am on Wednesday, March 16, 2022 to 3:00 pm on Wednesday, March 30, 2020 (prefecture ) except holidays. Submit by e-bidding system.
Documents to be brought in or mailed to the above location (excluding prefectural holidays) every day from 9:00 a.m. to 5:00 p.m. Submit by 3:00 p.m.
13 Bid submission location, acceptance period and submission method
(1) Submission location
7-7 Higashi Park, Hakata Ward, Fukuoka City, Fukuoka Prefecture
Fukuoka Prefectural Agriculture, Forestry and Fisheries Department Rural Development Division Bid Room (Prefectural Office Administrative Building 5F)
(2) Receipt period
Electronic bidding system operating hours from Thursday, April 14, 2022 to Thursday, April 28, 2020 at 12:58 pm.
(3) Submission method
A. Submit using the electronic bidding system.
B. The number of bidding executions shall be one.
C. In addition, according to the provisions of the bidding manual, bidding guidelines, and Fukuoka Prefecture electronic bidding operational standards.
14 Submission of construction cost breakdown and low bid price survey sheet
When bidding, submit a construction cost breakdown corresponding to the bid amount stated in the bid document using the electronic bidding system.
In addition, those who do not submit a construction cost breakdown at the time of bidding will be invalidated.
In addition, those who bid at a price lower than the survey standard comparison price shall submit the low bid price survey form before opening the bid according to Article 8, Paragraph 2 of the Low Bid Price Survey Trial Guidelines, and the low bid price Those who do not submit the questionnaire will invalidate the bid.
15 Date and place of bid opening
(1) Date and time
Immediately after the end of the bidding.
(2) Location
Same as 13 (1).
16 Bid deposit and contract deposit
(1) Bid deposit
Pay or provide a bid deposit of 5/100 or more of the estimated amount (including tax) or a collateral in lieu of this. But payment of bid deposit is exempted in the next case.
A When signing a bid guarantee insurance contract (5/100 or more of the estimated amount (including tax)) with the prefecture as the insured person and submitting the certificate
B Prove that you have fulfilled (2 cases) contracts of the same type and scale with this prefecture, local governments other than this prefecture, or the national government (including independent administrative agencies, etc.) within the past two years When submitting documents
(2) Contract deposit
Pay or provide a contract deposit of 10/100 or more of the contract amount or collateral in lieu of this. However, payment of the contract deposit is exempted in the following cases.
A When signing a performance guarantee insurance contract (10% or more of the contract amount) with the prefecture as the insured party with an insurance company and submitting the certificate
B. When a construction performance guarantee contract (10% or more of the contract amount) is concluded with an insurance company, etc., and the insurance company, etc. submits the certificate
17 Invalidation of bids
If a bid falls under any of the following, the bid will be invalidated.
(1) Bids with no stated amount
(2) Bidding that violates the bidding conditions indicated in laws or bidding manuals, etc.
(3) If the same bidder makes two or more bids, all bids of that bidder
(4) In the case of electronic bidding, the bidder has not obtained a valid electronic certificate (in the case of paper bidding, there is no signature of the bidder or his agent), and the bidder cannot be identified. bid
(5) Bids that cannot confirm the necessary information due to duplicated description of the amount or typographical errors or omissions
(6) Bidding where the bid deposit does not reach the amount specified in 16 (1)
(7) Persons who are not qualified to participate in the bidding, those who violate the conditions of bidding including those who have made a false application.) and a bid made by a person who made a false application
(8) Bids without lottery numbers (including bids where necessary items cannot be confirmed due to duplicate lottery numbers or typographical errors or omissions)
(9) Bids by those who bid below the survey standard price and do not submit a low bid price survey form before the bid opening.
In addition, the low bid price survey form shall be created based on the low bid price survey trial procedure and the low bid price survey document preparation procedure.
18 Presence or absence of survey reference price and disqualification reference price
Yes
19 Method of determining the winning bidder
(1) After opening the bids, suspend the determination of the winning bidder and end the bidding.
(2) Among those who applied with a price within the range of the planned price and the disqualification price, the candidate with the highest evaluation value obtained in 9(2) will be the successful bidder.
(3) If there are two or more people with the highest evaluation value, the successful bidder will be determined by lottery.
(4) If the bid price of the successful bid candidate is equal to or higher than the research reference price, that person is determined as the successful bidder.
(5) If the bid price of the successful bid candidate is less than the research standard price, the decision of the successful bidder will be put on hold and a survey will be conducted based on the Low Bid Price Survey Trial Guidelines.
(6) Those who bid below the survey reference price (hereinafter referred to as "low bid bidders") shall prepare a low bid price survey sheet and Submit the questionnaire concerned by e-bidding system by opening bid.
When preparing the survey sheet, it should be prepared based on the Low Bid Price Survey Trial Guidelines and the Low Bid Price Survey Material Preparation Guidelines (construction other than WTO projects).
(7) As a result of the low bid price survey, if it is recognized that there is no risk that the contract will not be fulfilled in accordance with the contents of the contract, that person will be selected as the successful bidder.
(8) As a result of the low bid price investigation, if it is found that there is a risk that the performance in conformity with the contract contents will not be performed, the person will be disqualified and other people will be targeted (1) The successful bidder will be determined by the following method.
(9) In principle, the winning bidder will be decided on the day the bids are opened.
If the successful bidder is determined by (10)(2), the bidder will be notified immediately, and the bid results will be available for viewing at the location in 6(1). We announce by method to publish on homepage of prefecture.
20 Conditions for contracting at a price below the survey standard price for this construction
(1) If contracting at a price below the survey standard price, The amount of the contract deposit prescribed in Articles 2 and 4 shall be 3/10 or more of the contract price (including tax).
(2) When contracting at a price lower than the survey standard price, the amount of penalty prescribed in Article 55, Paragraph 2 of the construction contract contract shall be 3/10 of the contract price (including tax). to do.
(3) When contracting at a price lower than the survey standard price, for construction where the planned price exceeds 500 million yen, the chief engineer or supervisor specified in Article 10, paragraph 1, item 2 of the contract In addition to engineers, one full-time engineer who satisfies the bid participation conditions specified in the tender manual, etc. shall be assigned. (If the successful bidder below the research standard price is a special construction work consortium, the representative member shall assign an engineer to increase the number of workers.)
In addition, in construction where the planned price is less than 500 million yen, a chief engineer or a managing engineer shall be assigned exclusively. (It is not permitted to concurrently serve as an on-site agent.)
(4) Site agents and engineers shall not be allowed to work concurrently with other construction work.
21 Others
(1) The language and currency used in the bidding and contract procedures are limited to Japanese and Japanese currency.
(2) Please refer to the bidding manual for details.
(3) Necessity of creating a contract Necessary
About introduction of low bid price investigation system in comprehensive evaluation method [other files/646KB]
Bid manual [PDF file/283KB]
Appendix 1 [PDF file/135KB]
Styles [other files/466KB]
Drawings, etc. [Other files/2.23MB]
Measures against non-participation in social insurance (notice) [Other files/16KB]
Other notes etc. [Other files/2.81MB]
(Revised on March 18) Tender announcement [PDF file/222KB]