General competitive bidding related to the Kunugiya District District of Kunugiya District 3rd year 3rd year from the Kunugiyan
We will announce the general competitive bidding as follows regarding the construction work ordered by Fukuoka Prefecture.
Ordinance March 15th, 4th, 4th
Fukuoka Prefecture Governor Hattori Seitaro
1.
Prefectural residence pond maintenance project (General) Kunugiya District District Randow 3rd FY2013 Tasuike Construction
2 construction location
Kanzaki, Fukuchi -cho, Tagawa -gun
3 Construction ordering method
(1) This construction is a target work of the comprehensive evaluation method (simple type) that accepts technical materials related to construction plans at the time of bidding, comprehensively evaluating elements and prices other than prices and determining the highest bidder.
(2) This construction does not apply the minimum limit price system and apply a low bid price survey system.
(3) This construction has a survey standard price (hereinafter referred to as "survey standard price") and disqualification standard price (hereinafter referred to as "disqualification standard price").
The details are "Fukuoka Prefectural Construction Work Low Bidding Price Survey Trial" (hereinafter referred to as "Low Bid Price Survey Trial").
(4) This construction is an electronic bid target where the bid procedure (from submitting a competitive qualification application application to the decision of the successful biders) is performed by the electronic bidding system.
(5) In this construction, when the arrangement of the supervision engineer (hereinafter referred to as "special supervisory engineer") who receives the provisions of the provisions of Article 26, Paragraph 3 of the Construction Business Law, the following is the following.All the requirements must be met.
(A.) A person who assists the duties of the supervision technician in the book of the Construction Business Law (hereinafter referred to as "assistant engineers") shall be placed on a full -time.
BThe technical test specifications based on the provisions of Article 27 of the Construction Business Law of the Supervisory Engineers shall be the same as the technical test specifications required by special supervision engineers.
C
D. The number of constructions that can be placed by the same special supervisory engineer shall be up to two at the same time, including this construction.(However, the same or separate ordering party is integrated with the work related to the contracted contract that overlaps the contract construction period that concludes with the same construction company, and the work that is subject to each construction.For those that are recognized (only when contracted contracts other than the initial contract are concluded by voluntary contracts), these multiple constructions are regarded as one construction.)
E. The construction that special supervisor engineers can also work must be construction in Fukuoka Prefecture.(Not limited to prefecture ordering work.)
Specially supervised engineers must properly perform duties such as participation in major meetings in construction, on -site patrols, and witnesses for major processes.
The system must always be contacted between the special supervision engineer and the assistant engineer.
To clarify the work that the assistant technician is responsible for.
Regarding the safety management system at the site, a special supervisor engineer does not also served as a supervisory safety and hygiene officer.
(6) In this construction, the budget for the 4th year of the assembly for the construction is established, and the budget of the country pertaining to the construction is determined, and the budget procedure is in place, and the procedure after opening after the bill is performed.
4 Construction Overview
Civil engineer set of construction
Tsutsumi H = 10.3 meters H = 64.4 meters
Slail work φ200 L = 19.6 meters
Bottom Guto φ800 L = 49.7 meters
Five construction period
From the date of conclusion of the contract to February 17, 1955 (Friday)
6. Names and location of the department in charge of office work related to the contract
(1) Thing about bidding procedure and construction
〒812-8577 Higashi Park 7, Hakata-ku, Fukuoka City, Fukuoka Prefecture
Fukuoka Prefectural Agriculture, Forestry and Fisheries Department Agricultural, Mountaineering and Fishing Village Promotion Division (Prefectural Government Administrative Building 5th Floor)
Phone number 092-643-3527
Fax number 092-643-3507
(2) Thing about contract procedure
820-0004, Iizuka City, Fukuoka Prefecture 8th Iizuka City No. 1
Fukuoka Prefecture Iizuka Agriculture and Forestry Office General Affairs Division General Affairs Section (Fukuoka Prefecture Iizuka General Building 4th floor)
Phone number 0948-21-4951
(3) Thing about browsing design drawings, etc.
820-0004, Iizuka City, Fukuoka Prefecture 8th Iizuka City No. 1
Fukuoka Prefecture Iizuka Agriculture and Forestry Office General Affairs Division General Affairs Section (Fukuoka Prefecture Iizuka General Building 4th floor)
Phone number 0948-21-4951
7. Bid participation qualifications (Local Autonomy Law Enforcement Ordinance (Advanced Ordinance No. 16 of 1945) A qualification specified based on the provisions of Article 167-5, Paragraph 1.
Civil engineer set of constructionについて、「福岡県が施工する建設工事等の請負契約に係る競争入札に 参加する者に必要な資格(平成28年3月福岡県告示第219号)」に定める資格を得ている者(令和3年度福岡県建設工事競争入札参加資格者名簿(以下「入札参加資格者名簿」という。)登載者)。
8 Bidding Participation Conditions (Local Autonomy Law Enforcement Ordinance refers to a bid participation qualification stipulated based on the provisions of Article 167-5, 2).
As of Wednesday, March 30, 4th, the following conditions shall be satisfied.
At the time of the successful bid decision, the same conditions shall be met.
(1) It is not a person corresponding to Article 167-4 of the Local Autonomy Law Enforcement Ordinance.
(2) It is not during the period of nomination suspension (hereinafter referred to as the General Affairs Director of the General Affairs Department of the General Affairs Department) of measures such as suspension of the construction company related to the construction of Fukuoka Prefecture (June 30, 1986).
(3) Fukuoka Prefectural Construction Construction Construction Competition Competition Rating and Selection Guidelines (September 22, 1978 General Affairs Director Yogi Yogi) Not during the measure based on the provisions of Article 7, Paragraph 2.
(4) A petition for the start of rehabilitation proceedings based on those who have been filed for the start of rehabilitation procedures based on the Company Rehabilitation Law (Act No. 154 of 2002) or the Civil Rehabilitation Law (Act No. 225 of 1999).Not a person (excluding the list of the bid participation qualified list of bidding participation based on the management item examination, which is the screening date after the decision to start rehabilitation or the start of the regeneration procedure is determined.)
(5) It is not a contractor who is associated with the trustee or the trustee of the contractor or the covenant in the capital and human resources.
(6) Complete the following conditions of the following A or a.
A. Construction Business Law (Act No. 100 of 1945) shall hold the main sales offices of the sales office in Article 3, Paragraph 1 in the jurisdiction of the Tagawa Prefectural Government Office.Alternatively, the main sales offices of the sales offices prescribed in Article 3, Paragraph 1 of the Construction Business Law have the main sales offices in the prefecture, and for 10 years, and other sales offices stipulated in Article 3, Paragraph 1 of the Construction Business Law.Held a place in the Tagawa Prefectural Satomi Development Office jurisdiction.
いずれの場合も、県内にExistenceする主たる営業所が、Civil engineer set of constructionについて入札参加資格者名簿に登載されており、業者等級別格付がA等級であること。
(B) The main sales offices of the sales offices prescribed in Article 3, Paragraph 1 of the Construction Business Law shall be held in the Tagawa Prefectural Temple Development Office.Alternatively, the main sales offices of the sales offices prescribed in Article 3, Paragraph 1 of the Construction Business Law have the main sales offices in the prefecture, and for 10 years, and other sales offices stipulated in Article 3, Paragraph 1 of the Construction Business Law.Held a place in the Tagawa Prefectural Satomi Development Office jurisdiction.
いずれの場合も、県内にExistenceする主たる営業所が、Civil engineer set of constructionについて入札参加資格者名簿に登載されており、業者等級別格付がB等級で総合数値が910点以上あること。
(7)平成18年度以降に公共工事の元請として、飯塚農林事務所管内においてCivil engineer set of constructionの施工実績(ただし、JVとしての施工実績は、出資比率が20%以上の構成員としての施工実績に限る。)をExistenceすること。
(8)平成18年度以降の公共工事の元請の技術者として、Civil engineer set of constructionに従事した経験のある専任の主任技術者又は監理技術者を本工事に配置可能であること。ただし、所属する建設会社と引き続き3カ月以上の雇用関係にあること。
In addition, the full -time engineer must be the one listed in the following.
A. Among the technical tests pursuant to the provisions of Article 27, Paragraph 1 of the Construction Business Law, the test events are first -class or second -class construction machinery construction, or the first or second class (limited to those that are “civil engineering”).Those who have passed the management.
B. Of the secondary examinations under Article 4, Paragraph 1 of the Technical Studian Law (Act No. 25 of 1980), the construction department, agricultural departments (elective subjects are “agricultural rural engineering” or “agricultural civil engineering”"(Limited to those who passed before 2018)), Forest category (limited to those whose elective subjects are" forest civil engineering "), and fisheries section (elective subjects are" fisheries corporation ".Passed the comprehensive technical supervision department (limited to those that are “agricultural civil engineering”, “forest civil engineering” or “fisheries corporation”).person.
(9) A simple construction plan must be appropriate.Appropriate means that there is a description of the necessary items, and that the ordering party has not clearly deviated.
9 Matters concerning comprehensive evaluation, etc.
(1) Evaluation items and evaluation criteria
Evaluation of each evaluation item in Table 1 shall be evaluated based on the evaluation criteria.
(2) Method of comprehensive evaluation
All bid participants who meet the "8 bid participation conditions" have a standard point (100 points), evaluates (1), and adds addition points in the range of 0 to 20 points as a technical evaluation point.Those who bid at the low bid price survey reference price comparative price will be given a construction system evaluation point (1.1 points), and the total score will be performed by the evaluation value obtained by the bid price.The evaluation criteria are as shown in Table 1.
(Calculation formula)
Technical evaluation point = standard point (100 points) + additional points (0 to 20 points)
Evaluation value = [(Technical evaluation point + construction system evaluation point (1.1 points)] / [Bid price]
(3) Successful bid method
A. A number obtained by (2) among those who bid with prices and technical materials and applied at the price within the scope of the planned price and the disqualification standard price (hereinafter referred to as "evaluation values").The highest one is a candidate for a successful bid, and the highest bidder is determined based on the low bid price survey.
(B) If there are two or more people with the highest valuation value, the lottery will determine a successful bid.
(4) Creating technical materials
Technical materials shall be created based on the bid manual.
10 Bid instructions
(1) period
Ordinance March 15th, 4th, 4th(火曜日)から令和4年4月27日(水曜日)までの毎日(ただし、福岡県の休日を定める条例(平成元年福岡県条例第23号)第1条第1項に規定する休日(以下「県の休日」という。)を除く。)、午前9時00分から午後5時00分まで。
(2) Place
6 (1) and (2) are the departments.It is also possible to download and obtain from the Fukuoka Prefecture website.
11 Where to indicate the contract provisions, etc.
The inspection of the construction contract book for the construction will be performed in 6 (2), and the specifications of the design drawings and specifications will be performed in the 6 (3) department.
12 Reception of applying for bid participation
Ordin, March 16, 4 (Wednesday), 4.30 am to 3:00 pm on Wednesday, March 30, 4th, 3:00 pm (excluding the prefecture holidays).
For the documents to be brought or mailed, at the location of 6 (1), every day (excluding the prefecture holidays), from 9:00 am to 5:00 pm (however, on the last day of the reception, 3:00 pm.Submit by 00 minutes).
13 Submission of bids, receipt period, and submission method
(1) Submission place
Fukuoka City, Fukuoka City, Hakata -ku, Higashi Park No. 7 7
Fukuoka Prefectural Agriculture, Forestry and Fisheries Department Agricultural, Fishing Village Promotion Division (Prefectural Government Administrative Building 5th Floor)
(2) Reception period
Ordinance from April 14, 4th (Thursday) to Ordians, April 28, 4th (Thursday), 4th (Thursday), 10:58 am.
(3) Submission method
A. Submit by an electronic bidding system.
B. The number of bid executions shall be once.
C) In addition, according to the provisions of bidding instructions, bid knowledge, and Fukuoka prefecture electronic bid operation standards.
14 Submission of construction expenses and low bid price survey forms
When bidding, submit a breakdown of construction costs corresponding to the bid amount described in the bids by an electronic bidding system.
In addition, those who do not submit the breakdown of construction costs will invalidate the bid.
In addition, those who bid at a price below the survey standard comparative price shall submit a low bid price survey form by opening a bid in Article 8, Paragraph 2 of the low bid price survey.Those who do not submit will invalidate the bid.
15 Dates and places of opening bids
(1) Date and time
Immediately after the bidding is over.
(2) Place
Same as 13 (1).
16 Bid deposit and contract deposit
(1) Bidding deposit
Payment or provision of a bid deposit of more than 100/100 of the estimated amount (including tax) or a replacement for this.However, in the following cases, the payment of the bid deposit is exempted.
A. When a bid warranty insurance contract (5/100 or more of the estimated amount (tax included)) is submitted by the prefecture and submit the securities
B. Submit a document that proves that the same species and the same size contract (including independent administrative agencies, etc.) or the same -size contracts (including independent administrative agencies) within the past two years have been proved (2).In case
(2) Contract deposit
Payment or provision of a contract deposit of 10/10 or more or an alternative to this.However, in the following cases, the payment of the contract deposit is exempted.
A. When concluding a fulfilling guarantee insurance contract with the insurance company (10/10 or more of the contract amount) with the prefecture's insured person and submitting the securities
B
17 Invalid of bidding
If the bid applies next, disable the bid of that person.
(1) Bidding without the amount of money
(2) Bids that violate the conditions related to the bid shown in the law or bidding manual, etc.
(3) If the same bidder has two or more bids, all biders of the bidder
(4) In the case of electronic bidding, the bidder does not obtain a valid telephone certificate (if it is a paper bid method, there is no name of the bidder or its agent), and the bidder is not known.
(5) Bidding that cannot be confirmed the necessary items due to duplication of the amount or typographical error or omission
(6) The bid deposit does not reach the amount specified in 16 (1)
(7) Persons who are not qualified to participate in bidding, those who have been confirmed to participate in competition participation, and those who have been in the first place at the time of the successful bid decision, such as those who are nominated for bidding.Included.) And the bids made by those who applied for falsehood
(8) Bidding without the lotter number (including bidding that cannot be confirmed necessary items due to overlapping lottery numbers or typographical errors or omissions.)
(9) A bid below the survey standard price, a bid does not submit a low bid price survey slip before opening.
The low bid price survey form shall be created based on the low bid price survey procedure and the procedure for creating a low bid price survey.
18 調査基準価格及び失格基準価格のExistence無
Existence
19 How to determine the successful bidder
(1) After opening, the decision of the highest bidder is suspended and the bidding is terminated.
(2) Among those who have applied at the price within the scope of the planned price and the disqualification standard price, the highest evaluation value obtained by 9 (2) shall be a successful bid.
(3) If there are two or more people with the highest valuation value, a winning bid will be determined by lottery.
(4) If the bidding price of the successful bid is more than the survey standard price, the person will be determined as a successful bidder.
(5) If the bidding price of the successful bid is less than the survey standard price, the decision of the successful bidder will be suspended and a survey will be conducted based on the low bid price survey.
(6) Those who make a bid below the survey reference price (hereinafter referred to as "low bid price bidders") have prepared a low bid price survey form and the survey of the low bid price survey in Article 8, Paragraph 2.Submit votes by electronic bidding system before opening.
In the creation of the survey form, it is based on the low -bid price survey trial and the preparation of a low bid price survey (construction other than the WTO project).
(7) If a low bid price survey is found to be not likely to be fulfilled according to the contract content, the person will be determined as a successful bidder.
(8) If it is deemed that the performance may not be performed according to the contract content as a result of the low bid price survey, the method will be disqualified, and for those other than that person, the method will be after (1).The successful bidder is determined.
(9) The decision of the successful bidder shall, in principle, shall be made on the opening date.
If the successful bidder is determined by (10) (2), the person who submitted the bid letter immediately will be notified, the bid results will be browsed at the location of 6 (1), and the homepage of Fukuoka Prefecture.Publish by the method to be posted in.
20 Conditions for contracting at a price below the survey standard price for this construction
(1) When contracting at a price below the survey reference price, the amount of the contract guarantee prescribed in Article 4, Paragraph 2 and 5 of the Construction Contract is 3/0 in the contract fee (including tax).This should be the above.
(2) When contracting at a price below the survey standard price, the amount of the penalty prescribed in Article 55, Paragraph 2 of the Construction Contract shall shall be 3/10 of the contract fee (including tax).
(3) In the case of a contract at a price below the survey standard price, in the construction of the planned price exceeding 500 million yen, the chief engineer or supervision engineer prescribed in Article 10, Paragraph 1, Item 2 of the contract.Separately, one engineer who meets the bid participation conditions specified in the bid manual, etc. shall be placed for a dedicated appointment.(In the case of a person who has a successful bid below the survey reference price, the representative member shall be arranged by the representative member.
In the case of construction where the planned price is less than 500 million yen, the chief engineer or supervision engineer shall be assigned to a full -time.(We shall not be allowed to work with the site agent.)
(4) On -site agents and engineers shall not allow the other work with other construction.
21 Others
(1) Languages and currencies used in bidding and contract procedures are limited to Japanese and Japanese currency.
(2) Details are according to the bid manual.
(3) Needs of creating a contract
Introducing the low bid price survey system in the comprehensive evaluation method [Other files / 646KB]
Bid manual [PDF file / 371KB]
Besides Table 1 [PDF file / 156KB]
Forms, etc. [Other files / 492KB]
Drawings, etc. [Other files / 11.71MB]
Social insurance such as social insurance (Notice) [Other files / 16KB]
Other precautions, etc. [Other files / 3.65MB]
Bid announcement [PDF file / 307KB]