Your Stand Installs an EV Charger with Advertisement at the Tsurumi Ward Office in Yokohama City, Controls the EV Charger with AI (Artificial Intelligence) Image Recognition Corporate Release
(2021/8/24)
Category: Product Service
Release issuing company: Yourstand Co., Ltd.
A new demonstration experiment of EV charging for the popularization of EVs
This time, we will install EV chargers with advertisements, and the advertising revenue will cover the cost of updating and maintaining the EV chargers. It has become a new model to collect. Also, as a control method, AI (artificial intelligence) image recognition is used. Yourstand will continue to search for new EV charging methods and provide EV charging services in various forms as we move towards the era of EV penetration.
Your Stand Co., Ltd. (Headquarters: Naka-ku, Yokohama, Representative Director: Nobuyuki Ura, hereinafter "Your Stand"), which is engaged in the introduction and operation of electric vehicle (EV) chargers, has recently announced Nagata Advertisement Co., Ltd. (Headquarters: Tsushima City, Aichi Prefecture; Representative Director: Ichiro Nagata, hereinafter referred to as Nagata Advertising) cooperated with Yokohama City, which is working on "Zero Carbon Yokohama", to create an EV with advertisements in the parking lot for visitors to the Tsurumi Ward General Government Building. I have to install the charger.
Background
Since its founding in 2018, Yourstand has introduced EV chargers mainly in housing complexes in the Tokyo metropolitan area, and has provided EV charging services using apps and systems developed in-house. I was. Yourstand is taking on the challenge of developing innovative initiatives in the field of EV charging while developing EV charging infrastructure for collective housing. With the ban on the sale of new gasoline-powered vehicles announced in the mid-2030s, EVs are expected to become more popular in the future. At the same time, the development of infrastructure for EV charging facilities is also an urgent issue.
Your Stand is part of a demonstration experiment to provide EV charging services without being bound by conventional stereotypes. I decided to install the device. Through this project, Your Stand will contribute to Yokohama City's "Zero Carbon Yokohama" and Sustainable Development Goals (SDGs) Goal 11 "Sustainable cities and communities" and Goal 9 "Industry and technological innovation." contribute.
Business Overview
In this project, with the cooperation of the advertising agency Nagata Advertising Co., Ltd., we will replace the charger that was out of order at the Tsurumi Ward Office in Yokohama City with Your Stand. replaces the charging system provided by A corner of the EV charger installation environment will be used as an advertising medium, and the income from advertising will be used to recover the cost of updating and maintaining the EV charger with advertisement. As a result, Yokohama City can provide EV charging services to residents without spending operating costs such as equipment renewal costs, system usage fees, and electricity bills.
In addition, in this demonstration experiment, we will provide a system that controls the start, end, and management of EV charging by image recognition by AI (artificial intelligence). We will provide visitors with a smart free charging service using machine learning, and at the same time, implement charging control according to the rules set by the facility. By digitizing charging trends and power consumption, administrators can visualize charging more and expand citizen services.
In the future, Your Stand will promote the development of a signage-integrated charger, and provide a free charging service to commercial facilities and public facilities where you want to install the charger, realizing clean movement. I will continue.
Installation overview
・Charging equipment
Installation location: Tsurumi Ward General Government Building Parking lot for visitors
Installation location address: 3-20-1 Tsurumichuo, Tsurumi-ku, Yokohama EV charger model: Hirakawa Hutec HCCID-K01HW
Output: Equivalent to 3kw
Cable length: 7.5m
How to use
Charging time: Up to 1 hour
Charging fee: Free
Available hours: According to the opening hours of the Tsurumi Ward General Government Building
Company profile
Company name: Your Stand Co., Ltd.
President: Nobuyuki Ura
Location: Sumiyoshi 24 Building 3F, 2-24-2 Sumiyoshi-cho, Naka-ku, Yokohama-shi, Kanagawa 231-0013
Business description: Introduction and operation of electric vehicle charging stations in apartments and workplaces
Telephone Number: 045-225-9755
Email address: ys-sales@yourstand-ev.com
Homepage: http://yourstand-ev.com
For company press release details
PRTIMES top
Source of this release: https://prtimes.jp/main/html/rd/p/000000004.000071105.html
* Product prices, specifications, and services listed in the news release Contents are current as of the date of publication. Please note that it is subject to change without prior notice.